Accepting offers, bids and proposals 0%
Budget $1,100.00      (Project not started)       0%  
Budget: Initial budgets are set by the project host and posting member. The budget can be based on available cash on hand or an educated guess to the actual costs. This can also be the willingness to pay only to the amount shown. Most budgets can be discussed with the project host to make more accurate numbers. You are welcome to educate our member regarding this project and it's estimated budget.
Completion Status: Updated by our member who posted the project. Look for Project accepting bids and proposals . This means you are welcome to submit your bid on this project. The poster will update the status to close out bidding and show the all of us how their project is going. If you see a project that needs to be updated please contact the poster using the contact form below. Any member can notify us regarding a project. We leave all completed projects online so images, prices, documents and videos can be viewed by others looking for the same type of work.
Industry: Insurance | WC GL

Details

Phase One of our project will require the following industry professionals.

NAICS 2017 Industry Codes

1. Industry 23811 Poured Concrete Foundation and Structure Contractors

2. Industry 23813 Framing Contractors

Estimated Costs:

1. Concrete Foundation / Structure workers: $26,764.00

2. Carpentry / Framing Contractors: $21,275.00

We expect our Concrete Foundation people to be completed within the first 30 days.

The Framing contractors or workers will be completed in the second 30 days if scheduling works.

We do not think we need General Liability since we are the contractors.

We do want to have a Builders Risk quote for Material damaged, theft, fire, flood etc.

We are big on safety and will have safety training each day for all workers and Workers Comp will be needed when we hire outside help.

Our quote request:
(GL = General Liability WC = Workers Compensation BR = Builders Risk)

Quote One: GL, WC, Builder Risk 90 days.

Quote Two: WC 90 Days.




#Project

Publish your Projects
Let Trade Pros find you.

 Register

Membership is Free

Tags

Comments

  • Request for copies of missing Flood 2016 Contracts from OCDDRU Flood Contract page

    Clara And Murray T.

    Request for copies of missing Flood 2016 Contracts from OCDDRU Flood Contract page

    Read
  • Here is a copy of a letter from the SBA El Paso TX office we hope you never receive.

    Supervisor O.

    Here is a copy of a letter from the SBA El Paso TX office we hope you never receive.

    Read