Image-1: Excavation for Foundation Footers
Foundations
  • Clara_and_Murray

    Clara_and_Murray

  • Project Request  September 1 2017 Completed: July 26 2017
  • 2.7K
  • 0

Excavation for Foundation Footers

Existing foundation will be used and tied into our new footers and foundations. We have slab on grade and are increasing the homes length. Please see designs attached. Email your bid to the address listed. You must sign in to do so.

Accepting offers, bids and proposals 0%
Budget $800.00      (Project not started)       0%  
Budget: Initial budgets are set by the project host and posting member. The budget can be based on available cash on hand or an educated guess to the actual costs. This can also be the willingness to pay only to the amount shown. Most budgets can be discussed with the project host to make more accurate numbers. You are welcome to educate our member regarding this project and it's estimated budget.
Completion Status: Updated by our member who posted the project. Look for Project accepting bids and proposals . This means you are welcome to submit your bid on this project. The poster will update the status to close out bidding and show the all of us how their project is going. If you see a project that needs to be updated please contact the poster using the contact form below. Any member can notify us regarding a project. We leave all completed projects online so images, prices, documents and videos can be viewed by others looking for the same type of work.
Industry: Foundations | Excavation

Details

Our new home requires foundation excavation, rebar work and concrete work.

We are willing to divide the work into 3 parts.

  1. Excavation & Compacting
  2. Termite treatment and certification
  3. Rebar and Concrete work.

Rebar is to be expoxied to excisting slab.

Footer depth 18" with 4" slab.

Please see images for dimensions.

I have the plans in PDF image and SketchUp if you indicate what format you need I may have them for you.

We are extending our slab on grade foundation to do pier and beam elevated.

The Piers will need strap between each.

We follow ICC 2012 on this project.

We will be using plastic no forms.




#Project

Publish your Projects
Let Trade Pros find you.

 Register

Membership is Free

We are rebuilding our home and would like our new windows to be no larger than the rough in sizes listed...

View Details

Tags

Comments

  • Request for copies of missing Flood 2016 Contracts from OCDDRU Flood Contract page

    Clara And Murray T.

    Request for copies of missing Flood 2016 Contracts from OCDDRU Flood Contract page

    Read
  • Here is a copy of a letter from the SBA El Paso TX office we hope you never receive.

    Supervisor O.

    Here is a copy of a letter from the SBA El Paso TX office we hope you never receive.

    Read
  • No articles, opinions, editorials attached to this page.